FDBusiness.com

Deliver Capital Projects Faster, Cheaper, Better

 Breaking News
  • UK Bottled Water Sales Top 4 Billion Litres For First Time Last year’s hot summer boosted UK water drinks consumption by more than 7% to 4,267 million litres, according to a new report from food and drink experts Zenith Global. This was worth an estimated £3.330 billion at retail prices. Sales of plain bottled water in retail packs increased by 7.9% to 3.4 billion litres, whilst [...]...
  • Morrisons Signs Up to Arla UK 360 Farm Standards Programme Arla Foods’s new farming standards programme Arla UK 360 continues to gain traction as Morrisons becomes the first retailer to commit to supporting the standards across its entire Arla milk supply. The move means approximately 200 Arla farmer owners will be directly supported by Morrisons to deliver across the eight farm business areas identified in [...]...
  • Vitafoods Europe 2019 – Guiding the Industry to a More Sustainable Future As environmental awareness reaches new heights and the world’s population continues to rise, the issue of providing sustainable foods which also offer a high nutritional value is set to grow, in both importance and complexity, over the next decade. It is with these considerations in mind that Vitafoods Europe 2019 has developed its agenda. The [...]...
  • Nordzucker to Invest €100 Million in Swedish Sugar Production Nordzucker Group will concentrate its sugar production in Sweden at its factory in Örtofta and as part of this process the refinery at Arlöv will be closed. Around €100 million will be invested in the strategy. The project is expected to be completed in autumn 2021. Based at Braunschweig in Germany, Nordzucker Group is one [...]...
  • FrieslandCampina Plans to Build a Sustainable Dairy Processing Plant International dairy co-operative Royal FrieslandCampina is exploring options to build a sustainable and innovative dairy processing plant in the Netherlands. The plant is intended for the processing of member milk into fresh dairy products, ingredients used for the production of early life and adult nutrition, and for cheese manufacturing. It would be built according to [...]...

Deliver Capital Projects Faster, Cheaper, Better

Deliver Capital Projects Faster, Cheaper, Better
May 20
11:50 2014

Most managers and engineers have had firsthand experience of capital projects that failed to live up to expectation when introduced and needed significant attention during routine operation. The excess capital costs of these troublesome assets can be huge.

Opportunity costs are high too. One organisation DAK Consulting supported estimated that improvements in capital project delivery, was enough to recoup the original capital investment during the first year.

Early Equipment Management

EEM (Early Equipment Management) is a continuous improvement process that will systematically improve your organisations ability to deliver new product, new equipment and new systems in less time with less resource and higher return on investment.

The goals of EEM are to deliver flawless operation from day 1 and lowest on-going operational life cycle cost. This is achieved through the use of collaborative project processes to capture latent weaknesses as early as possible and prevent problems from progressing past the current step.

* Steps 1 and 2 contain activities to Define the correct scope of the project and involve the right expertise;

* During Steps 3 and 4 contain activities to tease out latent design weaknesses and enhance project value to achieve a robust Design;

* During steps 5 and 6 contain activities to Refine the operational design and develop internal competence.

DAK Consulting’s analysis shows that the difference between an “average” and “simplified” design can be worth a 30% reduction in capital costs. The same analysis shows that “complex” designs can increase capital costs by more than double when compared to the “average” design. That alone is enough reason to take care at the design review stage.  However, capital costs are normally a small % of the total life cycle costs so the gains from EEM can be worth as much more.

Find out more about EEM or DAK Academy’s EEM training workshop 15-17 July 2014 contact Sue at Sue.Catt@DAK Consulting.co.uk, Tel +44(0)1491 845504 or visit www.dakacademy.com.

About Author

mike

mike

Related Articles



Food & Drink Business Conference & Exhibition 2016

Upcoming Events

  • June 18, 2019Multimodal 2019
AEC v1.0.4

find food jobs

The Magazine

F&D Business Preferred Suppliers

New Subscriber

Subscribe Here



Advertisements